Carrying out all installation operations, including fully equipping the workshop to carry out the project, including fixed and temporary equipment until the end of the project, as well as dismantling the workshop. Excavation, collection, and transportation of excess soil and waste from the pipeline route to the location designated by the employer. Earthworks and consolidation of some pedestal installation locations using appropriate materials, construction and installation of concrete pedestals for supports and pipe racks.

Spooling, spool manufacturing, fit-up, welding and performing NDT (RT) tests according to the design percentage. Installation of piping, valves, gaskets and sealing of flanges. Conducting precise mapping and adjusting the pipeline route. Providing and implementing scaffolding in the required locations and collecting scaffolding, metal scraps, supports, and other equipment after completion of the work.

Manufacturing and installing supports and pipe racks, installing valves, bolts, and gaskets. Performing flushing operations on all piping lines, touch-ups, and installing all connections and equipment, including valves and precision instrumentation equipment, if needed. Implementation of reinstatement operations.

Excavation of the support installation site, foundation construction, provision of required materials, cutting and bending of reinforcements, reinforcement, and concrete pouring of pedestals in accordance with the latest standards.

Cutting the thickener body and supplying and installing the nozzle to connect to the 12-inch piping.

اطلاعات پروژه
وضعیت پروژه :
خاتمه یافته
تاریخ شروع پروژه :
1402/03/06
پایان پروژه :
1402/06/27