Cart Total Items (0)

Cart

VIRASANAT

درباره پروژه 

Supply of equipment (all pipes and piping fittings…), supply of required materials (iron, cement, rebar,…), construction and installation of all metal structures and supports, testing of the 12-inch pipeline of the Tinker concentrate overflow line of the flotation plant

اطلاعات پروژه
وضعیت پروژه :
خاتمه یافته
تاریخ شروع پروژه :
20/03/1403
پایان پروژه :
13/10/1403