Installation and supply services for pipes, fittings, hoses and hydraulic path correction of FDSM machine in Khatoon Abad Refinery

Purchase, construction and installation of the ventilation system of the acid loading shed 2 of the Sarcheshmeh Copper Complex in Rafsanjan, using a PC

Plumbing and insulation repair of drinking water in Acid Building 2, Sarcheshmeh Copper Complex, Sarcheshmeh Copper Complex

Smelting Overhaul – Replacing Material Transfer Pipes and Outlet Chutes of Dryer Screens of Flash Furnace of Sarcheshmeh Copper Complex, Rafsanjan

Bricklaying of the opening of the sulfuric acid plant 2 of the Sarcheshmeh Copper Complex in Rafsanjan

Construction of a 12-inch pipeline for the overflow line of the slag flotation plant of the Sarcheshmeh Copper Complex

Replacing the copper cooling element of the flash furnace jet burner and chain bar 010

Repair and, if necessary, replace the insulation and body sheets of the ‘BALLOON DUCT, DUST CHAMBER, GCT’ of converter furnaces such as the construction and replacement of the basic GCT of various sections of inspection hatches and guide vanes, and repair and, if necessary, replace the gutters and eaves of the roof of various areas of the Sarcheshmeh Copper Complex Smelting Plant.

Execution of the project for the procurement of materials, construction, and installation of the access path.

Performing some overhaul tasks in the dryer section of the smelting department at the Sirjan Copper Complex during the 2024 overhaul.

Performing some overhaul tasks in the boiler section of the smelting department at the Sirjan Copper Complex.

Installation and commissioning of the RAP switch and emergency stop at the Midouk concentration plant.

Construction, installation, and creation of the maintenance station corridor for the overhead cranes at the Phase 2 side concentration plant of Midouk.

Construction, installation, and creation of the maintenance station corridor for the overhead cranes at the Phase 1 side concentration plant.

Purchase, construction, and installation of the ventilation system for the acid loading hall 2 at the Sirjan Copper Complex in Rafsanjan.

Construction of a 12-inch pipeline for the overflow line of the slag flotation plant at the Sirjan Copper Complex in PC (Pre-assembled) format.