Cart Total Items (0)

Cart

VIRASANAT

درباره پروژه 

Replacement of mechanical hammers interface Reduction, convention boiler, 50 hammers, replacement of Omega tube pipes of boiler inlet opening in the amount of 18 meters (inlet), replacement of Omega tube pipes protection plate of boiler inlet opening in the amount of 18 meters, installation of 3 inspection hatches on the body of chain bar 001 flash boiler

اطلاعات پروژه
وضعیت پروژه :
خاتمه یافته
تاریخ شروع پروژه :
1403/04/24
پایان پروژه :
1403/05/13