- Dismantling, transporting and unloading all insulation, covering sheets and damaged parts of the equipment to the employer’s warehouse in compliance with safety standards.
- Cleaning the internal coating of equipment including GCT, TOP GCT and Dust Chamber.
- Dismantling the guide vanes inside the Top GCT and manufacturing and installing new guide vanes.
- Replacing all bolted connections in Top GCT with fireproof thread to improve performance and proper sealing.
- Fixing leaking inspection hatches by repairing or replacing them, along with implementing fireproof thread to ensure sealing.
- Repairing damaged parts of the equipment body to increase the durability and performance of the structures.
- Substructure and strapping of ducts for insulation and coating in TOP GCT and Dust Chamber.
- Installing ceramic wool and rock wool along with appropriate straps and netting in TOP GCT to improve thermal insulation.
- Installation of aluminum cover along with all ancillary equipment in TOP GCT, Dust Chamber, GCT and Balloon Duct.
- Dismantling old gutters and downspouts and replacing them with new parts if necessary.
- Sandblasting and painting all metal structures, equipment, and supports to protect against corrosion and increase durability.
- New chassis design and modification of old supports to provide the necessary strength for equipment and coatings.
- Dismantling old pipes and gutters, welding and installing new pipes and gutters along with all related accessories.
Insulation:
- Scaffolding and creating the necessary protections for safe access to ducts and carrying out the required activities.
- Complete separation and removal of sheet metal covering and rock wool insulation from ducts in preparation for new insulation.
- Removing and grinding the pins holding the old insulation from the metal surface of the ducts.
- Repair and replace inspection hatches to improve equipment performance and safety.
- Replacing damaged parts of the duct body and renovating worn parts.
- Surface preparation for insulation and coating using stainless steel in the required areas and carbon steel in the relevant areas.
- Implementing a chassis for installing cover sheets using stainless steel or carbon steel straps, appropriate to the material of the duct body.
- Implementing ceramic wool and rock wool insulation in OP GCT to improve thermal efficiency and prevent energy loss.
اطلاعات پروژه
وضعیت پروژه :
پروژه ادامه دارد
تاریخ شروع پروژه :
1403/07/09
پایان پروژه :